Did a bunch of little things this weekend.
Got the roof on the Hearse and started putting the foam on the sides.

Built 3 monster mud frames. 2 with pointing arms and 1 with both arms up to hold something?


Started working on the skeleton frieze that will go in the alcoves of the Cathedral. Just 80"x36" piece of plywood with a 2" foam covering glued down around the edges. We will then carve out a space for the skeleton and then screw him to the plywood and then build up around him to make it look like he was carved out.
No comments:
Post a Comment