Did a bunch of little things this weekend.
Got the roof on the Hearse and started putting the foam on the sides.
Built 3 monster mud frames. 2 with pointing arms and 1 with both arms up to hold something?
Started working on the skeleton frieze that will go in the alcoves of the Cathedral. Just 80"x36" piece of plywood with a 2" foam covering glued down around the edges. We will then carve out a space for the skeleton and then screw him to the plywood and then build up around him to make it look like he was carved out.
We also did some tombstone carving and carved a sign to add to our Davis Graveyard sign next month.