We got a lot of stuff done but didn't take a lot of pictures. We built the lattice work for the big back windows of the Abbey. Finished hanging all the panels on the lower back side. Built all the trim needed. Made a few new panels for the front to block off the back area. We finished painting our 2nd TOT.
Subscribe to:
Post Comments (Atom)
1 comment:
The window details are really nice :)
Post a Comment