As part of our basement remodel and adding a half bathroom and tankless water heater we have removed most of the metal pipe in the basement and replaced it with PEX. We need to get the plumbing up into the joists in the basement so we can drywall the ceiling.
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment